Skip to Content
Click-lock plank being laid over a kitchen floor

โ† All services Built for busy rooms

LVP & laminate

Plank flooring for kitchens, basements and busy rooms. Here is how a plank floor goes in.

  1. 1. We measure and check the subfloor

    Plank flooring needs a flat subfloor. We measure the rooms and check for dips and high spots, because a floor that is not flat will show later in the joints.

  2. 2. The planks sit in the room first

    Boxes are left in the room where they will be installed so the material settles to the temperature and humidity of the house before anything is cut.

  3. 3. Underlayment goes down

    Underlayment is rolled out over the subfloor, with a moisture barrier where the room calls for one, such as a basement or a slab.

  4. 4. Planks are laid with an expansion gap

    Rows are laid with the joints staggered, and a gap is left around the perimeter so the floor can move with the seasons instead of lifting.

  5. 5. Cuts, thresholds and trims

    Planks are cut around door frames, cabinets and vents, and transitions are fitted where the floor meets another room.

  6. 6. We leave it ready to walk on

    Off-cuts and packaging leave with us and the floor is cleaned before we hand it back.