โ All services Made for high traffic
Glue-down carpet
Carpet bonded directly to the floor for basements and high-traffic areas. Here is how a glue-down job is done.
-
1. We measure and look at the subfloor
Glue-down goes straight onto the subfloor, so the subfloor is the job. We measure the rooms and check what we are bonding to.
-
2. The surface is prepared
The subfloor is cleaned and made sound and dry. Adhesive does not stick to dust, and it does not stick to damp.
-
3. Adhesive is spread with a notched trowel
The trowel leaves ridges of a set depth, which is what gives an even bond across the whole area instead of patches.
-
4. The carpet is laid into the adhesive
Carpet is set into the wet adhesive and rolled so the backing makes full contact and no air is trapped underneath.
-
5. Seams and edges are finished
Seams are cut and joined, and the carpet is trimmed at walls, doorways and any transition.
-
6. It is left to cure
The adhesive needs time before heavy traffic and furniture come back. We tell you how long for the room in question.